Define the product and process scenario before defining the facility.
A proposed readiness assessment could begin with dosage form, material hazards, intended batch scope, demand assumptions and receiving operator. Material attributes, unit operations, hold points, sampling and measurements could then be connected through a product-specific process map.
Scale models and simulation could support engineering judgement, but they would require confirmation against suitable physical evidence. Controlled environments would not imply sterile capability.
